Total Area:
55.72h a/ 137.684 acres of Volcanic Red Soil

Water:
-
113 megalitre Water Allocation
-
5 megalitre Dam (springfed)
-
70 megalitre Dam
-
10 megalitre Dam
-
Serviced by 2 electric motors & pumps
-
Computerised Irrigation & Fertigation System with under tree sprinklers

Improvements:
-
1 bedroom Brick Unit
-
Packing Shed 27m x 20m with 3 Coldrooms (2 large, 1 small)
-
Workshop 20m x 9m (includes smoko room, shower/toilet & chemical storage)
-
Outdoor Nursery area between Sheds 20m x14m
-
Machinery / Implements Shed 16m x 10m

Trees:
Total 9430
-
Avocados 8689 (Mature – 4210 & Young 2019/21 – 4479) (Hass – 6229, Shepards – 1573, Wurtz – 887)
-
Mangoes 741 KP

Additional Land:
additional 16.26ha currently fallowed for future plantings

Machinery:
included Inventory of Plant & Equipment available upon request