• 162m modern tilt slab construction
• 3 Phase power
• Mezzanine Floor No Charge
• Container size roller door
• Own internal amenities
• Good parking
• Close to public transport

For further information or to arrange an inspection, please contact Steve Black or Trevor Nelson-Jones.