Comprising a total land area of approx. 1522.1m2, with street frontage of approx. 15.72m and rear width of 15.255m, backing onto the Georges River Reserve and Georges River. DA approval for Torrens-title sub division into two lots, although final sub-division has not yet been registered with Land Titles Office. Sub-division work undertaken to date includes: demolition and reconstruction of side of upper level of dwelling and associated structures; reconstruction of stormwater easement; reconstruction of driveway; construction of side boundary wall.

First Lot: The Land
A total land area of approx. 777.1m2 and has concept DA approval for a large 3 level home. Provision has been established for all standard residential services and more, which includes sewer, water, power, telephone, cable, street to dwelling internal communications.

Second Lot: Front House
A total land area of approx. 745m2 and includes a 3 level, double brick (on lower levels) concrete floored dwelling. The dwelling has the potential for the upper level to be permanently sectioned off from the lower levels to create two independent sizable residences. The dwelling has DA approval for renovations to all three levels of the dwelling to achieve an ultimate 4 x living areas, 5-7 bedrooms, 5 x bathrooms, 2 x kitchens/laundry, as well as other accommodation features. Renovations are well underway with the lower and middle level renovations in principle completed.

Outdoor area to the rear:
9m x 5m approx. pebblecrete swimming pool with covered outdoor entertaining area overlooking Georges River and established garden.
Large secure storage area/wine cellar

Outdoor area to the front:
Double entry driveway with ample parking for a boat, caravan or 6 x cars
Large single garage / workshop (7450 x 3400)
Established garden with pond
Land survey undertaken in 2013 for a now approved Section 96 1A amendment (plan included)
Approved DA’s and Construction Certificates still current
Progress Certification obtained as required
Final Occupancy Certificate due when DA and Construction Certificates complete
Supporting documentation included and / available to view in the office by appointment with Tony.

Disclaimer: We have, in preparing this document, used our best endeavours to ensure that the information contained herein is true and accurate to the best of our knowledge, but accept no responsibility and disclaim all liability in respect of any errors, omissions, inaccuracie