Yes, construction is at a very early stage (May 2010) but the footings are in and if you like to plan ahead here’s your chance! Secure your new home by exchanging contracts now, and have your say on the interior finishing touches while your home is being built. Estimated completion date approx. November 2010 (should be in for Christmas)! Plans are for a 5 bedroom two storey home; 4 bedrooms upstairs with the main opening onto a balcony; plus upper living room; 5th bedroom downstairs next to the shower, toilet and handbasin. There is a spacious open plan kitchen with stone bench tops and gas/electric cooking adjoining family and informal meals area. A large covered outdoor alfresco is accessed from the family room. The formal area has an interesting twist, with combined dining and lounge and adjoining sitting room / study. For floor plans and further details call Jim on 0400 996 680.