Built in approximatley 2002, the improvements are suitable for fabrication, manufacturing and/or engineering. There are two buildings on site, bisected by a concrete driveway. The western building is the main facility and has all of the office area and amenities. The building is 2,961sqm, has 1,000kva, 5 tonne gantry cranes and 6 on grade roller shutter doors. The eastern building is 2,739sqm, has 1000kva, four 5 tonne gantry cranes and 4 on grade roller shutter doors. Both buildings are concrete tilt up, with steel portal frame and metal deck roof. Internal warehouse clearance is 8m minimum, with 6m hook height under the cranes. On site parking for 53 cars.