Turn-Key Inclusions List
Additional Engineering “M Type” Soils
Rural Fencing 900 high to perimeter
Mail Box – 900 High Brick with numbers
Driveway and Paths – Exposed Aggregate or plain stencil driveway, 5 wide 8.5 m long
Tank and Pump – 10,000lt supplied and installed
Tank and Pump – dig and prepare base
Antenna supplied and installed
Wall mounted Clothes line supplied and fitted
Carpet to bedrooms, supplied and installed as per colour boards
Tiles to all living areas, supplied and installed as per colour boards
Lighting package to the value of $600
Landscaping package to the value of $1,500
Window Coverings Eco White slate to windows
Vertical blinds to doors
Turf supplied and laid – 400m2
Preparation for turf – bobcat and labour
Water Truck hire
Standard Inclusions List
PRELIMINARIES CHARGES INCLUDED
Council fees and charges to (includes water connection, excludes town planning if required)
Building Services Authority insurance premium
Standard house plans by qualified draftsman / designer, complying with energy efficiency regulations
Soil testing by engineer, contour survey to house site
Portable long service leave levy
Workplace health and safety notification and levy
Comprehensive builders all risk, works insurance during construction
MANDATORY ITEMS
Rainwater Tank Connection up to $1,690 value. Builder to connect to the house as per local council
regulations & includes Leaf Eaters to down pipes.
Earth Leakage circuit breaker to all circuits, excluding Hot Water circuit
Hardwired smoke detectors where required by law
Water tempering valves, reduce the chance of scalding
Non return valves to taps as required
Scaffolding and edge protection during construction
Sediment control to local authority regulations
SITE WORKS AND ALLOWANCES
Earthworks site Cut / Fill allowance to fall 1000mm fall over house pad (excluding rock and trees)
Traditional concrete slab and external footing beams (not waffle pods)
Footings and slab inspection by designing engineer prior to pouring
Steel reinforcing calculated on final engineer’s footing & slab design (excluding soil abnormalities)
Concrete calculated on final Engineer’s of footings & slab (excluding soil abnormalities)
Concrete pump supplied
Single phase power connection, as supplied by local authority
Sewerage connection total of 45 lineal metres clear of slab
Stormwater to connection point up to 10M from Slab (using 100mm sewer grade, piping
underground